Sign up for our mailing list.



GAF Mission

"to TEACH inner city youth and/or underprivileged persons to be successful entrepreneurs while revitalizing inner city neighborhoods with a concentration on socially responsible/sustainable business practices"

GAF is the
Western Mass Office for

Comment on Prepping The Lot For Drainage by Lisa


Posted on by admin

cleared site 300x200 Prepping The Lot For Drainage

Now the site is cleared and the work can begin to create the parking lot which will feature plenty of spots compared to our current lot.

While you will never see it, the drainage system will be very cool. In order to send storm water as slowly as possible into the city sewer system, we have installed a system of drywells that could contain a “50 year” storm.  This is the worst storm that might come along only once every 50 years.  The drywells are perforated cement containers fed by drains in the parking lot surface.drywells from the side2 300x200 Prepping The Lot For Drainage There is enough capacity to contain the water from the “50 year” storm and let it gradually drain out through the perforations. Visit the drainage gallery to see more pictures of the process.

This entry was posted in Expansion. Bookmark the permalink.

One Response to Prepping The Lot For Drainage

  1. Lisa says:

    LOVE IT!!! What a forward thinking initiative to lighten the burden of storm water overflow into the river!


Leave a Reply Cancel reply

Comments are closed.